AC Construction Ltd. is the contract awardee for the construction of a perimeter wall around the A. O. Shirley Recreation Grounds. The contract was signed on Friday 10th May 2019 for $193,368.60.

The perimeter wall will be constructed with panels made of locally recycled high-density polyethylene (HDPE).

View the Contract Award Summary.