Reservoirs and Metering – Zion Hill and Carrot Bay
BACKGROUND
This project will be implemented by the Ministry of Transportation, Works and Utilities with support from the RDA. This has been fully funded by the Government of the Virgin Islands through the Caribbean Development Bank Recovery and Rehabilitation Loan.
STATUS: Procurement Underway
Ministry Partner: Ministry of Natural Resources, Labour, and Immigration
Project Number: 145
Project Start Date: 2020
Projected End Date: TBC
Stay up to date on all of project by reviewing our monthly reports: RDA Monthly Reports.
Activity
The projects will include the provision of new water reservoirs, retaining walls and metering at three separate sites, Zion Hill, Carrot Bay and Long Bush. The works include demolition and site clearance and the construction of new bolted glass fused to steel corrosion resistant water tanks. This design allows for quick construction and minimal lifetime maintenance costs and is one of the most advanced and long lasting technologies available for the storage of liquids.
The design which was produced by SWS out of Italy used world class modelling software to optimize tank sizing as well as the water distribution networks at Zion Hill, Carrot Bay and Long Bush in order to provide efficient and effective water delivery to those networks.
The design phase followed a thorough process of site investigation and modelling techniques which take into account, geological, geotechnical, hydrological, seismic and climatic conditions in order to determine the optimum design for the conditions or potential conditions to be found here in Tortola.
The work on this project will commence immediately following the signing of the contract
Result
The work will start immediately providing a significant injection into the economy of the BVI and significant improvement to the water storage capacity at these three locations as well water distribution and leakage monitoring in the future.
FUNDING
Please reach us at feedback@bvirecovery.vg or through our Contract Us page if you’d like to provide a donation to this project.
BUDGET: To be released once planning for the project has been finalised.