{"id":6275,"date":"2021-09-15T14:01:53","date_gmt":"2021-09-15T14:01:53","guid":{"rendered":"https:\/\/bvirecovery.vg\/?p=6275"},"modified":"2021-09-15T14:11:53","modified_gmt":"2021-09-15T14:11:53","slug":"monthly-report-july-2021","status":"publish","type":"post","link":"https:\/\/bvirecovery.vg\/old\/monthly-report-july-2021\/","title":{"rendered":"Monthly Report &#8211; July 2021"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.0.8&#8243; max_width=&#8221;100%&#8221; min_height=&#8221;1000px&#8221; max_height=&#8221;1000px&#8221; custom_margin=&#8221;-6px||||false|false&#8221; custom_padding=&#8221;0px||||false|false&#8221;][et_pb_row _builder_version=&#8221;4.4.8&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.5.3&#8243; text_text_color=&#8221;#474747&#8243; background_color=&#8221;rgba(0,0,0,0)&#8221; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; link_option_url=&#8221;https:\/\/bvirecovery.vg\/old\/oldwp-content\/uploads\/2021\/02\/12-Monthly-Report-December-2020.pdf&#8221;]<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>In July, a contract was signed with Tortola Paving Ltd. for Asphaltic Works for the six completed road rehabilitation and slope stabilization sites. Demolition work on the Zion Hill Reservoir project was completed in July, paving the way for installation of the new tank which will be the last of four tanks installed across the Territory as part of the Water Network Rehabilitation project. Tank installation has been completed at both Carrot Bay and Long Bush sites. The Road and Water Infrastructure projects form part of the portfolio of Rehabilitation and Reconstruction Loan projects funded by the CDB. Of note in terms of other projects, in July work on the Anegada Administration Building reached practical completion, with final touches on tiling, handrails and landscaping completed. July also saw contract signing with Sunleaf Construction and commencement of works for fencing of the Anegada Recreation <em>Facility. <\/em><\/p>\n<p><span style=\"font-size: 15px;\" data-offset-key=\"3vak6-0-0\">View the full report <\/span><a style=\"font-size: 15px;\" href=\"https:\/\/bvirecovery.vg\/old\/oldwp-content\/uploads\/2021\/09\/07-Monthly-Report-July-2021.pdf\"><span style=\"color: #3366ff;\">onli<\/span><\/a><span style=\"font-size: 15px; color: #3366ff;\"><a href=\"https:\/\/bvirecovery.vg\/old\/oldwp-content\/uploads\/2021\/09\/07-Monthly-Report-July-2021.pdf\">ne<\/a><\/span><span style=\"font-size: 15px;\"> to keep updated on what the RDA is doing to support the Recovery of the Virgin Islands.<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.0.8&#8243; max_width=&#8221;100%&#8221; min_height=&#8221;1000px&#8221; max_height=&#8221;1000px&#8221; custom_margin=&#8221;-6px||||false|false&#8221; custom_padding=&#8221;0px||||false|false&#8221;][et_pb_row _builder_version=&#8221;4.4.8&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.5.3&#8243; text_text_color=&#8221;#474747&#8243; background_color=&#8221;rgba(0,0,0,0)&#8221; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; link_option_url=&#8221;https:\/\/bvirecovery.vg\/old\/oldwp-content\/uploads\/2021\/02\/12-Monthly-Report-December-2020.pdf&#8221;] &nbsp; &nbsp; In July, a contract was signed with Tortola Paving Ltd. for Asphaltic Works for the six completed road rehabilitation and slope stabilization sites. Demolition work on the Zion Hill Reservoir [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":6273,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p>The August 2019 Monthly Report contains status updates of projects during that month, as well as news on planning, policy and communications.<\/p><p><span style=\"text-decoration: underline;\">A brief summary of the report:<\/span><\/p><ol><li>There are seven projects in the planning phase, four in the procurement phase and eight in the operations phase.\u00a0 Two projects have been completed.<\/li><li>A list of events and communication releases for the entire month is included.<\/li><li>The RDA has a list of confirmed grants\/contributions that will fund some of our many projects.<\/li><li>Detailed updates on several projects.<\/li><\/ol><p>View the report <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/bvirecovery.vg\/old\/old\/oldoldwp-content\/uploads\/2019\/10\/Monthly-Report-August-2019-1.pdf\">onli<\/a><\/span><span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"https:\/\/bvirecovery.vg\/old\/old\/oldoldwp-content\/uploads\/2019\/09\/Monthly-Report-July-2019.pdf\">ne<\/a><\/span>\u00a0to keep updated on what the RDA is doing, or download it for future reading.<\/p>","_et_gb_content_width":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[36,35],"tags":[],"class_list":["post-6275","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-monthly-reports","category-pubs","post_format-post-format-image"],"_links":{"self":[{"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/posts\/6275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/comments?post=6275"}],"version-history":[{"count":4,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/posts\/6275\/revisions"}],"predecessor-version":[{"id":6280,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/posts\/6275\/revisions\/6280"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/media\/6273"}],"wp:attachment":[{"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/media?parent=6275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/categories?post=6275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bvirecovery.vg\/old\/wp-json\/wp\/v2\/tags?post=6275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}