BOB’S GAS STATION – SLOPE STABILISATION AND ROAD REHABILITATION
RDA now invites sealed bids from eligible bidders for the Bob’s Gas Station – Slope Stabilisation and Road Rehabilitation Project.
The works include but are not limited to general site clearance and disposal, cleaning and desilting of existing drains, demolition of an existing section of asphalt and reinforced concrete pavement and the construction of:
• 35m of reinforced concrete pavement with 50mm asphalt overlay
• 34m long by 2.5m high reinforced concrete retaining wall
• 190m of reinforced concrete box drains with metal grills
• 70m of swale drains
• 60m of reinforced concrete kerb walls
• 55m of guard rails
Bidding documents will be sent to bidders electronically upon request to procurement@bvirecovery.vg with the subject title “Request for Bidding Documents for Bob’s Gas Station – Slope Stabilisation and Road Rehabilitation”.
The Pre-Bid/Site Visit meeting will take place on Tuesday, 16 June, 2020 at 10:00 a.m. at the RDA’s Lobby, 1st Floor, Ritter House, Wickham’s Cay II, Road Town, Tortola, British Virgin Islands
BID SUBMISSION DEADLINE: Tuesday, 14 July, 2020 at 10:00 AM.